The Yamal LNG project is an example of successful international cooperation between the Russian Federation and European countries. Watch in Sabetta with accommodation

The Yamal Peninsula is actively developing new center gas production, which in the future will become one of the main ones for the development of the Russian gas industry. Up to 360 billion cubic meters will be produced in Yamal. m of blue fuel.

Place of Birth

trillion m 3 of gas

billion tons of gas condensate

million tons of oil

Place of Birth

trillion m 3 of gas

billion tons of gas condensate

million tons of oil

  • Bovanenkovskoye, Kharasaveyskoye stable condensate per year.
  • Tambey industrial zone

    Consists of six fields: Severo-Tambeyskoye, Zapadno-Tambeyskoye, Tasiyskoye, Malyginskoye (licenses belong to the Gazprom Group), South-Tambeyskoye and Syadorskoye.
  • Southern industrial zone

    Includes nine fields: Novoportovskoye (the license belongs to the Gazprom Group), Nurminskoye, Malo-Yamalskoye, Rostovtsevskoye, Arkticheskoe, Sredne-Yamalskoye, Khambateyskoye, Neytinskoye, Kamennomysskoye. The zone is considered as a priority oil production facility with a maximum annual level of 7 million tons.
  • A new generation gas transmission corridor from the Bovanenkovskoye field to Ukhta has been created for the unified gas supply system of Russia. Year-round export of oil is carried out through the offshore oil terminal "Gate of the Arctic".
  • Infrastructure

    A full-fledged system of industrial and life support has been formed: roads, power plants, a shift camp, industrial bases, Railway"Obskaya - Bovanenkovo ​​- Karskaya" with a length of 572 km, airport.

The number of deposits is 32.

Total reserves and resources of all fields on the Yamal Peninsula: 26.5 trillion cubic meters. m of gas, 1.6 billion tons of gas condensate, 300 million tons of oil.

Video about the Yamal megaproject, 3 minutes

Mining in Yamal:

In 2017 - 82.8 billion cubic meters. m of gas.

In the future - up to 360 billion cubic meters. m of gas per year.

Structure of the megaproject

Bovanenkovo ​​industrial zone

It has the main production potential and includes three fields - Bovanenkovskoye, Kharasaveyskoye, Kruzenshternskoye (the licenses belong to the Gazprom Group). Gross production here is estimated at 217 billion cubic meters. m of gas and 4 million tons of stable condensate per year.

Tambey industrial zone

Consists of six fields: Severo-Tambeyskoye, Zapadno-Tambeyskoye, Tasiyskoye, Malyginskoye (licenses belong to the Gazprom Group), South-Tambeyskoye and Syadorskoye.

Southern industrial zone

Includes nine fields: Novoportovskoye (the license belongs to the Gazprom Group), Nurminskoye, Malo-Yamalskoye, Rostovtsevskoye, Arkticheskoe, Sredne-Yamalskoye, Khambateyskoye, Neytinskoye, Kamennomysskoye. The zone is considered as a priority oil production facility with a maximum annual level of 7 million tons.

Hydrocarbon transportation system

To transport gas from the Yamal Peninsula to the Unified Gas Supply System of Russia, a new generation gas transmission corridor was created from the Bovanenkovskoye field to Ukhta. Year-round export of oil is carried out through the offshore oil terminal "Gate of the Arctic".

Infrastructure

A full-fledged industrial and life support system has been formed: roads, power plants, a shift camp, industrial bases, the Obskaya-Bovanenkovo-Karskaya railway with a length of 572 km, and an airport.

Project implementation

The largest Yamal field in terms of proven gas reserves is Bovanenkovskoye. The primary object of development is the Cenomanian-Aptian deposits. In 2012, the first gas field (GP-2) was commissioned at the field, in 2014 — the second (GP-1), in 2018 — the third (GP-3). The total design capacity of the three fields is 115 billion cubic meters. m of gas per year. In the future, with the commissioning of the Neocomian-Jurassic deposits, the design capacity of the Bovanenkovskoye field will increase to 140 billion cubic meters. m of gas per year.

Put into operation in 2012 main gas pipeline Bovanenkovo ​​- Ukhta, at the beginning of 2017 - the Bovanenkovo ​​- Ukhta - 2 gas pipeline.

Competitive advantages

    traditional high concentration reserves located on land

  • well-studied geology and proven development technologies
  • very low development and production costs
  • high efficiency of the liquefaction process due to low average annual temperature
  • access to the markets of Europe and the Asia-Pacific region
  • government support, including tax incentives


Project infrastructure

The field development project provides for the drilling of 208 wells at 19 well pads. The gas produced at the field will be supplied to the international market in the form of LNG, for which a gas liquefaction plant will be built, consisting of four technological lines. The first line of the plant with a capacity of 5.5 million tons of LNG per year was put into operation in December 2017. The infrastructure for loading LNG for export consists of an unloading rack with two berths in the port of Sabetta, equipped with ice protection facilities. Reinforced ice-class tankers Arc7 are used for LNG transportation.

Project implementation status

The final investment decision on the project was made in December 2013.

LNG production on the first production line of the plant started on December 5, 2017. Yamal LNG shipped the first batch of 170 thousand cubic meters of liquefied natural gas on December 8, 2017. In August 2018, Yamal LNG shipped the first batch of LNG after the launch of the plant's second process line. In November 2018, Yamal LNG produced the first LNG at the third production line.

During a working trip to the Yamalo-Nenets Autonomous Okrug, Vladimir Putin got acquainted with the progress of construction of facilities for the second and third stages of the Yamal LNG plant for liquefying natural gas in the village of Sabetta, located on the coast of the Kara Sea.

The head of state launched the loading of the first gas carrier at the Yamal LNG plant. At the command of Vladimir Putin, fuel began to flow into the tanks (capacity 172,000 m³) of the Christophe de Margerie ship.

The vessel is able to navigate the Northern Sea Route without the help of icebreakers all year round to the west from Yamal, to European ports, and within six months (fromJuly to December) - to the east, to the ports of the countries of the Asia-Pacific region. Previously, the period of summer navigation in the waters of the eastern sector of the Northern Sea Route was limited to four months and only in the presence of icebreaking escort.

"Christophe de Margerie" crossed the Northern Sea Route in record time >>

The first cargo of the Yamal LNG project was bought by the British branch of the Malaysian energy giant Petronas. Now the icebreaking LNG tanker Christophe de Margerie is heading from the port of Sabetta to the Danish port of Skagen, where it will arrive on December 17.

There, the liquefied gas will be transferred to a conventional LNG tanker, not ice-class. This carrier will deliver the first cargo of the Yamal LNG project to the Dragon LNG regasification terminal in Milford, owned by Petronas LNG UK.

This sale was made on a spot basis, and all subsequent sales until April will be the same. next year. And in April, deliveries will begin in accordance with long-term contracts, LNG World News reports. And as noted by the Chinese corporation CNPC, about 4 million tons of liquefied gas produced by the Yamal LNG project will be sent to China.

In addition, Yamal LNG and the Belgian Fluxys signed a 20-year contract for transshipment of up to 8 million tons of LNG per year in the port of Zeebrugge. These volumes will then be sent to the markets of the Asia-Pacific region.

In a conversation with workers at the Yamal LNG liquefied natural gas plant, Vladimir Putin said: Now we can safely say that Russia in this and the next 100 years will grow in the Arctic. Here are the main largest reserves mineral raw materials. Here, I am sure, the future is a very good and efficient transport artery - the Northern Sea Route. Therefore, this step that you have taken is very important for the country as a whole, not only for the energy sector and not only for LNG projects, but in general. New jobs, infrastructure development, comprehensive development. This is very important, I repeat, for Russia».

It is frosty on Sabetta, taking into account the wind, the temperature is below -30 ° C, all participants in the celebrations knew that they were going to the Yamal Arctic. Among the distinguished guests, in addition to the ministers of the Government of Russia, are the government delegations of France, China (NOVATEK's partners in the Yamal LNG project are representatives of the French Total, Chinese CNPC and the Silk Road Fund), Governor of the Yamalo-Nenets Autonomous Okrug Dmitry Kobylkin, ministers and deputies Russia.

Came to the solemn event and the Minister of oil of Saudi Arabia Khalid al-Faliha. Earlier, al-Falih admitted that he wants to visit Yamal, but for this he needs the appropriate equipment. " I hope I will go to the launch of an LNG plant in Russia, I need warm clothes”, he told reporters a week ago. The Minister was not in vain worried about warm clothes. On Friday, the air temperature in Sabetta was -26°С. This summer, al-Falih already tried to visit the LNG plant in Sabetta (Yamal), but was unable to get there due to bad weather.

« Buy our gas, save oil the President told Saudi Oil Minister Khalid al-Falih. The Saudi minister congratulated on the launch of the Yamal LNG project, and responded to Putin's proposal with the words, "that's why I'm here." After that, the president and the minister exchanged a few whispered phrases that the surrounding journalists could no longer hear.

According to Putin, cooperation between Russia and Saudi Arabia in the field of energy will turn the countries from competitors into partners, which will positively affect the work of both states, Russian President Vladimir Putin said. " If we continue to work in the same way, then we will turn from competitors into partners, and everyone will only benefit from joint work.", - Putin said at the ceremony of loading the first batch of liquefied natural gas at the Yamal LNG plant during a conversation with Saudi Oil Minister Khalid al-Falih.

The Minister, for his part, noted that such cooperation will change the world energy market. According to him, Russia and Saudi Arabia work in the field of oil, but oil and gas are closely interconnected. " We hope the Russian Federation and Saudi Arabia will work together. Our companies from our countries will work together", the minister said.

Gas carriers for Yamal LNG "Boris Vilkitsky" and "Fyodor Litke" delivered to the customer >>

Recall that on December 5, 2017, the Yamal LNG plant (Sabetta, YNAO) began production of liquefied natural gas (LNG) on the first production line with a design capacity of 5.5 million tons of LNG per year. The project is being implemented on the Yamal Peninsula beyond the Arctic Circle on the basis of the Yuzhno-Tambeyskoye field.

The capital expenditures of the project amounted to $27 billion, of which about $13 billion were invested by the shareholders. Yamal LNG also attracted $19 billion of external financing from the National Welfare Fund, the Russian Export Credit and Investment Insurance Agency, Sberbank, Gazprombank, China Development Bank, Export-Import Bank of China, Intesa of Italy, Italian and French export-import agencies, Japan Bank for International Cooperation, Raiffeisen of Austria, Euler Hermes of Germany and EKN of Sweden.

The project operator is OAO Yamal LNG, a joint venture between OAO NOVATEK (50.1%), the TOTAL concern (20%), the China National Oil and Gas Corporation (20%) and the Silk Road Fund (9.9%).

The start of construction of the international Arctic industrial complex with the seaport of Sabetta was marked by the laying of a commemorative capsule in July 2012. The symbolic foundation stone of the strategic facility was laid by Russian Minister of Transport Maxim Sokolov, Governor of the Yamalo-Nenets Autonomous Okrug Dmitry Kobylkin and Chairman of the Board of NOVATEK OJSC Leonid Mikhelson. The intention to create a high-tech center for the production of liquefied natural gas in Yamal was supported by Russian President Vladimir Putin and the Government of the Russian Federation. The international project was implemented on time, demonstrating responsible cooperation with partners from different countries. " The level we have achieved in joint work, will continue to promote joint efficient operation for the benefit of the companies that take part in this, for the benefit of our countries. Will maintain a stable level in the international energy market, create favorable conditions for the development of the world economy”, - noted Vladimir Putin, commenting on the level of interaction of all participants.

The second arc7 class tanker "Shturman Malygin" was launched >>

Almost 700 domestic enterprises from 60 regions of Russia took part in the implementation of the project, a large professional team specialists.

Even at the stage of construction of the plant, the seaport "Sabetta" started working in the normal mode. In 2016 alone, about 1,200 ships of various classes and about 3 million tons of cargo were accepted and serviced by the Yamal harbor, and the Northern Sea Route received a new development impetus.

The construction of the port of Sabetta in terms of its scale is the largest infrastructure project in the world, implemented in the Arctic latitudes. It represents the creation of an approach channel in the northern part of the Gulf of Ob, about 50 kilometers long, 300 meters wide, 15 meters deep, directly in the water area of ​​the port of Sabetta, its area is about 130 hectares.

In 2015, dredging was carried out in the port water area, approach and sea channels, the total volume of reclaimed soil exceeded 16 million m³. To protect the port water area, the construction of a southeastern ice protection structure more than 2 km long was underway, on which an unloading rack for LNG and stable gas condensate was being installed.

The port of Sabetta will be able to ship up to 17 million tons for the transportation of goods along the Northern Sea Route. The plant's capacity assumes LNG production up to 16.5 million tons, which will be achieved in the first quarter of 2019 after the launch of the second line of the plant. At the same time, it was also decided to build a fourth line for 1 million tons based on Russian technology for the production of LNG.

To date, the company has completed construction of half of the power plant capacity for the project, which could reach 376 MW. The Yamal LNG project involves 15 countries and 650 Russian enterprises. At the same time, the volume of orders in Russia has already exceeded 648 billion rubles. Approximately 32,000 people work at the facility.

And today, on December 8, the unique in its design gas tanker "Christophe de Margerie" class "Arc7", loaded with liquefied natural gas, is preparing for the first voyage to supply fuel to consumers.

Recall that Russian and foreign classification societies and leading design and engineering institutes, shipyards and ship-owning companies took part in the development of the Arctic tanker. The tanker has a double action system - the bow is adapted for navigation in open water and in conditions thin ice, and the stern is optimized for independent navigation in difficult ice conditions. It is planned that 15 such vessels will be built.

The second largest nuclear-powered icebreaker in the world left the slipway of the Baltic Shipyard >>

The Arctic tanker fleet, custom-built for the Yamal project, will also run on LNG fuel. It is planned that 15 tankers similar to the Christophe de Margerie will be manufactured. Today, another gas tanker, named after the legendary Arctic explorer Boris Vilkitsky, is waiting to be loaded in Sabetta.

It is noteworthy that even at the start of the project, long-term contracts for the sale of 95% of LNG were signed.

LNG is the fuel of the future, and Yamal is a unique place in the Arctic in terms of its extraction, production and transportation to the countries of the Asia-Pacific region and Europe along the Northern Sea Route, especially considering the prospects for the development of LNG centers on the Yamal Peninsula and Gydan (YaNAO). " Yamal is rich in its reserves, unique in its location. LNG production could exceed 70 million tons. A production and logistics hub is already being formed in the region with a promising share in the world market of more than 15 percent in LNG", - said the governor of the region.

Thanks to Yamal LNG, a production and logistics hub with a promising global market share of more than 15% is already being formed in the YaNAO, Kobylkin noted. The next steps in this direction have already been determined - these will be new LNG plants. There are resources for this both on the Yamal Peninsula and on the Gydan Peninsula, the head of the YNAO said.

Articles you may be interested in:

The Belkomur highway will provide an opportunity to implement 40 major investment projects >>

Northern latitudinal course to be >>

Nuclear-powered icebreaker sailed the first ship with anthracite in the Arctic >>

Four artificial islands to be created in the Barents Sea >>

Seven reasons for the high efficiency of Nord Stream 2 development >>

WATCH THE VIDEO:

Longline fishing vessel Nuclear-powered lighter carrier "Sevmorput" Launching of the nuclear icebreaker "Arktika" Nuclear reactors for icebreakers

The Yamal LNG project: a significant event recent years, comparable in scale and prospects, perhaps, with the development of Western Siberia half a century ago

 

Reference Information:

  • Name: Gas liquefaction plant Yamal LNG.
  • Purpose of the object: production of liquefied natural gas.
  • Start of construction: year 2012.
  • Completion: 2019 year.
  • Object cost: 27 billion dollars.
  • Who is building (main general contractor/beneficiary): PAO NOVATEK/L. Michelson.

The shift camp beyond the Arctic Circle called Sabetta, on the shores of the Yamal Peninsula, is far from being a resort. And although planes fly here quite often, the airport itself will be better than in many major cities Russia, you can't buy tickets. People come here to work, watch. Only KamAZ can easily drive from the air harbor to the village where the workers of the Yamal LNG liquefaction plant live, which is near the village of Sabetta, and the huge torch next to the plant is now considered a local landmark. From his power, the snow melts in the area, and the howl of the flame is simply deafening.

Just a few years ago, Sabetta became part of the Northern Sea Route. The seaport here was built as part of a public-private partnership. Nuclear icebreakers Rosatomflot allows servicing the sea route in the Far North zone. And this allows for all year round delivery of goods to the port all year round. In winter, icebreaking assistance is used. This port is one of the most important reference points of the Northern Sea Route, the shortest route connecting Europe and Asia. It is destined to become the main base for the development of the Yamal fields and provide year-round navigation along the Northern Sea Route.

Rice. 1. Integrated project for the production, liquefaction and supply of natural gas
Source: site lightproduction.ru

Subtotals

But at the beginning of December 2017, almost all news agencies wrote about this small village. It was here that the President of the Russian Federation arrived with distinguished guests, including:

  • Khalid al Falih, Minister of Energy of Saudi Arabia;
  • Patrick Pouyanne, President, Chairman of the Board of Directors of Energy Company Total;
  • Wang Yanzhi, General Manager of the Silk Road Fund;

    The Silk Road stretched all the way to the north. Let's combine it with the Northern Sea Route, and we'll have what we need. And we will make the Northern Sea Route a silk one” (V. Putin).

  • Saudi Aramco, CEO of the most powerful national Saudi oil company.

Distinguished guests are invited to attend the loading ceremony of the Christophe de Margerie tanker, the first merchant ship in the world to sail to these places without icebreaking assistance.

“Without the participation and trust of foreign partners, this project would not have taken place. And he himself is named after our friend de Margerie (President of Total, who died in October 2014). It is a pity that today he is not with us” (V. Putin).

On that day, the first batch of liquefied gas was shipped from Yamal LNG to the tanker. Not everyone believed in the project. But there were people who were not afraid to take risks and proved to the whole world that this risk was justified.

A large delegation visited Yamal LNG, a world-class plant, the first enterprise of its kind built in the Arctic. 15 countries and hundreds of domestic enterprises are involved in its construction. This construction will cost $27 billion.

It's no secret that strategic oil and gas Russian companies subject to sanctions. But even being included in the Western sanctions lists did not become an obstacle for the main shareholder of Novatek PJSC in attracting external financing. The first phase of the project was completed in deadlines And this is in such harsh conditions. Moreover, and this is especially valuable, the initial estimated cost is not exceeded.

But that was only the beginning.

Yamal LNG project

It is implemented on the basis of the South Tambeyskoye gas field, the proven and probable reserves of which are estimated at 1.3 trillion cubic meters. meters of gas and 60 million tons of condensate. The license of Yamal LNG to develop the field is valid until 2045. Having such a resource base means having a guarantee of reliable operation for at least 25-30 years.

“About 14,000 people will be employed during the construction of the plant, and after its completion in 2018, 1,400 jobs will be created at the enterprise” (Igor Kholmanskikh, Plenipotentiary Representative of the President of the Russian Federation in the Ural Federal District).

It provides for the production of 16.5 million tons of LNG per year and up to 1.2 million tons of gas condensate. Supplies finished product planned for European markets and mainly countries of the Asia-Pacific region, new for Russian gas.

Rice. 2. Yamal LNG plant
Source: site geostarspb.ru

The entire plant will be built from 360 modules, of which 111 are technological. This equipment is produced at seven Chinese and three Indonesian shipyards.

The launch of the first line took place in December 2017, when the first LNG tanker was shipped. At the moment, two million tons of LNG have been shipped from the first stage of the plant.

Yamal LNG shipped the second million tons of LNG from the first stage of the plant. Gas supplies have been carried out since December last year by Arctic gas carriers of the Arc-7 class with a capacity of about 74,000 tons. The two millionth ton was shipped in 27 lots. In April 2018, LNG supplies began under long-term contracts, under which 4 batches have already been shipped. In April, the first ignition of gas turbines of compressors of the second stage of the plant with a capacity of 5.5 million tons was also completed, which is one of the milestones preparing the queue for launch” (company announcement on May 7, 2018).

The project provides for the construction of the necessary transport and social infrastructure in order to ensure efficient and safe work project.

The second (in 2018) and third (in 2019) stages are to be launched. The total volume of investments for all stages I-III of the complex is $27 billion.

“I think that the second line will be introduced three months earlier [plan] and the third line will be introduced 6-9 months earlier” (Leonid Mikhelson, Chairman of the Board of NOVATEK).

How OAO Yamal LNG started

The gas reserves explored in Yamal and adjacent territories make this region a leader in Russia. Today, more than 20% of Russian gas is located in Yamal, so that local deposits are the main territory for the production of "blue" fuel.

Joint-Stock Company was established over ten years ago. Novatek with 60% of the shares, Total with 20% and CNPC with 20% of the shares became its shareholders. Recently, the Silk Road Fund joined the shareholders, after Novatek sold it a 9.9% stake, retaining a controlling stake.

In 2012, the main construction began. The approach to it was implemented complex. The first shift workers in Sabetta, then still a tiny and unknown settlement of the Nenets, appeared in 1980. But only with the development of a large-scale project, the settlement received development, and now world fame.

The construction of a seaport, a gas liquefaction plant, a modern Sabetta airport and the Sabetta settlement itself began, the population of which increased to 20,000 people.

Gas is supplied to the plant from wells through pipes laid above the ground. There, gas condensate, methanol and other foreign fractions are separated from it. The ideally dry gas obtained as a result of purification is sent for liquefaction, and from there through pipes to storage tanks. There are four of them, each with 160 thousand cubic meters. meters. They were built in 2016 in permafrost conditions. At the base of each there are 948 piles, 24 meters deep each. They have passed all the necessary hydraulic tests.

  • Sea port of the company "Yamal LNG".

    The seaport of Sabetta was built specifically for the shipment of liquefied gas. The port of the Yamal LNG company has become a gateway to the Arctic and a key link in the construction of the plant. Moreover, not only liquefied natural gas but also other goods.

Work on a rotational basis at the Yamal LNG project in Sabetta. The vacancies of which are posted on the official website. The professions in demand for men and women are a driver, a technician, a mechanic, a welder, an installer, an electrician, a commandant, a cook, etc. In 2019, Yamal LNG OJSC plans to put into operation one production line plant for the production of liquefied gas, so the question, Yamal LNG - vacancies, is currently very relevant.

Shift work and vacancies Yamal LNG in the shift camp. Reviews of employees about work in the North. How to get a job at Sabetta as a shift. Contacts of the personnel department of the direct employer. Are there vacancies for women. Professions handyman, driver, electrician. Vacancies of the YAMAL LNG company for shift work for 2019 at Sabetta - an integrated project for the production, liquefaction and supply of natural gas. You can find out how to get a job in a company, what kind of work they offer in the North on the official website. And also on specialized resources for posting vacancies.

Fill out your CV ➤

Contacts of the personnel department for employment, phone, current vacancies are available on the official website of Yamal LNG http://yamallng.ru/career/open_vacancies/ - select an open vacancy from the list and on this page there will be a button "send finished resume". The text and vacancies posted below are for reference only.

Work on the Yamal LNG on a rotational basis

The company pursues a personnel and social policy in compliance with the most stringent and highest world standards. Yamal LNG - vacancies for representatives of various specialties, workers from different countries take part in the implementation of the project.

Fill out your CV ➤

In addition to the construction of the plant, a modern airport is being built for international communication and seaport, as well as other transport infrastructure facilities. The construction of the plant is carried out in several stages, the launch of which is planned in 2019-2019. Up to 16 million tons of LNG will be supplied annually to Europe and the Asia-Pacific region, in addition, up to 1.2 million tons of gas condensate will be sold.

Working conditions in Yamal LNG are constantly improving, so they are safe and comfortable, all workers are provided with full social package, medical insurance, there is an opportunity to take advantage of a sanatorium and resort recovery. The company is actively developing, therefore qualified workers of various specialties are constantly required.

Today, there is a large selection of vacancies, and you can apply for one that matches your education and work experience. The most relevant vacancies: managers, IT-specialists, financial and economic specialists, chemical analysis laboratory assistants, engineers in various fields of work, process plant operators.

Yamal LNG - vacancies for specialists in various specialties. The main advantages that allow the company to successfully compete in today's market:

  • deposits are located on land and have a high concentration;
  • development technologies are well developed;
  • studied geology;
  • minimum funds are spent on field development and gas production;
  • climatic conditions make it possible to effectively carry out the liquefaction process;
  • established market in Europe and the Asia-Pacific region;
  • tax breaks and other government support.

Many vacancies require people with experience in similar work, but there are also those where they accept without work experience, for example, laborers, drivers various categories driving, there are vacancies for women.

Vacancies in gas production in Yamal

It is planned to produce gas from 208 wells, it will be supplied to the market in liquefied form, therefore, starting from 2017, three technological lines are commissioned, each with a capacity of 5.5 million tons of liquefied gas per year.

An unloading rack with two berths is being equipped in the port of Sabetta. Cargo berths are already working, so delivery building materials held continuously throughout the year. This project provides for the construction of the largest LNG plant in Russia.

This largest enterprise on the Yamal Peninsula, which provides people in this region with highly paid jobs, average salary is 120,000 rubles. Yamal LNG - vacancies for shift work. Usually shifts are 30/15, 30/30, 60/30, but there may be others, so when applying for a job, be prepared to leave your family, your usual life for a while and work in harsh climatic conditions.

Since the construction of the plant is planned until 2019, the need for new specialists will be relevant for a long time to come.

Watch in Sabetta with accommodation

The stronghold of Yamal LNG is the village of Sabetta, which has created comfortable conditions for living, recreation and leisure of workers. There are cozy canteens, a hotel, a bathhouse, a sports complex, food warehouses and other facilities. The infrastructure is constantly expanding, a laundry, living quarters, a warm parking lot, a new canteen are being built, so actual vacancies are appearing. More than 15,000 people are already involved in the implementation of this project, and if you hurry, you can soon join them.

Feedback from employees about working in the North

The project provides for the construction of a plant for the production of liquefied natural gas (LNG) on the resource base of the Yuzhno-Tambeyskoye field. The proven and probable gas reserves of the field according to PRMS standards are 926 billion cubic meters. m. As part of the implementation of the Project, a transport infrastructure is being created, including a seaport and an international class airport Sabetta.

Fresh selection of Yamal LNG vacancies for today

Welding engineer 1st category

OAO Yamal LNG
Sabetta (Yamal-Nenets Autonomous Okrug)
Technical supervision, implementation and coordination of work to determine compliance with the established requirements of the performed welding work and object (welded structure) during construction ...
…in oil and gas, oil refining and/or LNG production facilities. Knowledge of welding methods: RD, RAD. MP, MPG, AF, AAD.

Chemical engineer / Chemist engineer


Carrying out the full range of analyzes offered by the chemical analysis laboratory, including the distribution of tasks among the laboratory staff. Preparing the laboratory for accreditation…
Higher education in the field of chemistry and chemical technologies. The following courses are preferred: Chemistry for the Oil and Gas Industry, Laboratory Analysis Courses…

Electrical engineer (category 1) / supervisor (power supply section)

OAO Yamal LNG Sabetta (Yamal-Nenets Autonomous Area)
Control and supervision over compliance with the current legislation, regulatory legal acts, requirements of administrative and normative documents to technical condition electrical installations: PS…
Higher professional education(electricity supply / energy). Experience: At least 3 years of experience in a similar position. English language- free.

Lead Power Engineer, Power Supply Division

OAO Yamal LNG
Sabetta (Yamal-Nenets Autonomous Okrug)
Implementation of organizational and technical support full cycle or individual stages of operation of electrical installations: Substation 35/10 (6) kV, ZRU-10 (6 ...
Higher professional education (electricity supply / energy). Experience in the specialty: at least 3 years of experience in a similar position.

IT Trainer (Technical Support)

OAO Yamal LNG
Moscow, Prospekt Vernadskogo and 2 more CAREER.RU
Assembly, installation and modernization of the PC. Diagnostics of hardware and software in order to detect faults. Repair of PC hardware by replacing a faulty ...
Knowledge of PC hardware and peripherals. Knowledge of Windows XP / Vista / 7. Knowledge of basic network protocols and services.

Chemical analysis laboratory assistant

OAO Yamal LNG
Sabetta (Yamal-Nenets Autonomous Okrug)
Performing timely sampling in strict accordance with the regulatory and technical documentation and the sampling schedule. Carrying out scheduled analysis of gas samples, gas…
Higher or secondary special education in the field of chemistry and chemical technologies or secondary specialized, laboratory assistant certificate 4th/5…

Treatment plant operator / chemical water treatment operator (water treatment plant, 3rd category)

OAO Yamal LNG
Sabetta (Yamal-Nenets Autonomous Okrug)
Implementation of start-up and shutdown of water treatment facilities, guided by the instructions of the senior operator of the control panel. Security safe operation technological equipment and pipelines.
Education secondary special or higher, preferably in the specialization of V&K. Availability of a qualification certificate for the operator of treatment facilities / wastewater treatment operator / operator ...

Welding master

OAO Yamal LNG
Sabetta (Yamal-Nenets Autonomous Okrug)
Production of welded structures (products, products: metal structures, pipelines, equipment) in accordance with established requirements to quality. Analysis of the plan / schedule for the production of welded…
Secondary vocational education. Experience in certification of welding equipment and technologies. Experience in leading a link (team) of welders during welding (construction, repair) of responsible ...

Leading Specialist of the Information Systems Support Group (Sabetta, YNAO)

OAO Yamal LNG
Sabetta (Yamal-Nenets Autonomous Okrug)
Administration, optimization of the company's information systems (SED Directum, 1C, Drilling monitoring, project management systems). Administration of MS SQL 2008 DBMS…
Higher technical education. Practical experience: - Installation, configuration, administration, optimization of configurations based on 1C: Enterprise 8.2, 8.3 ...

MECHANICAL ASSEMBLY WORKER

duties:

Execution production tasks received from the master of the repair and mechanical workshop for the repair of equipment and its post-repair testing;
Installation, configuration, diagnostics (troubleshooting), repair and Maintenance mechanical equipment (pumps of various types, valves, gate valves, etc.);
Providing daily reporting on the work done, participating in safety meetings and informing the supervisor of any malfunctions or deviations;
Compliance with the requirements for the issuance of work permits;
Assistance in the preparation of work permits;
Receipt at the warehouse of spare parts and accessories necessary for the performance of work;

requirements:

Secondary special education;
Possession of a locksmith's certificate mechanical assembly works(minimum 3 digits) required;
Work experience of 5 years as a repair technician in the workshop and in the field at the enterprises of the oil and gas and petrochemical industries;
Experience with systems for issuing work permits;
Skills in determining the necessary spare parts for repair / restoration work and experience in compiling and placing requests for them;
Required: experience in the revision and repair of shut-off and control valves (namely: ball and plug valves, gate valves, valves, safety valves, spring and impulse (pilot), control valves, check valves, etc.);
Experience with mechanical and hydraulic systems;
Proven skills in the use of manual and special tools (centering, for tightening, for mounting and disassembling flange connections, for working with pipelines and flexible pipes).

HEAT NETWORK SERVICE WORKER

The construction of the natural gas liquefaction plant is carried out in three phases with the launch in 2017, 2019 and 2019, respectively. The project provides for the annual production of about 16.5 million tons of liquefied natural gas (LNG) and up to 1.2 million tons of gas condensate with supplies to the markets of the Asia-Pacific region and Europe.
The project is being implemented by OAO Yamal LNG, whose shareholders are largest companies in the field of production and processing of hydrocarbon raw materials: OAO NOVATEK - 60%, Total - 20%, CNPC - 20%.

Personnel policy

OAO Yamal LNG in its activities complies with high international standards in matters of social and personnel policy. Our project is implemented by representatives of various nationalities and states. common purpose and strong team are the main conditions for the successful implementation of the Project. The company creates comfortable and safe working conditions, takes care of the social security of employees by providing compensation, voluntary medical insurance, the possibility of health resorts and recreation.

Fill out your CV ➤

JSC YAMAL LNG is an actively developing company interested in cooperation with highly qualified specialists.

Vacancies watch on Sabetta

Moscow (5)
MANAGER OF INVESTMENT PLANNING AND FINANCIAL ANALYSIS DEPARTMENT (DECRET RATE)
CHIEF SPECIALIST OF THE DEPARTMENT OF INFORMATION TECHNOLOGIES (MOSCOW)
ENGINEER OF 1 CATEGORY
HVAC engineer
CHIEF SPECIALIST OF THE FINANCIAL AND ECONOMIC DEPARTMENT
Sabetta/LNG plant (46)
________________________________________
DEPUTY HEAD OF THE CORROSION GROUP
HEAD OF THE SECTION OF GENERAL FACILITIES
DEPUTY HEAD OF THE GROUP OF ELECTRICAL EQUIPMENT OF GENERAL FACILITIES, POWER PLANT, STORAGE AND SHIPMENT OF FINISHED PRODUCTS
SENIOR ELECTRIC ENGINEER (PROCESS LINES SECTION)
ENGINEER 1 CATEGORY (EQUIPMENT OVERHAUL GROUP)
Mechanical engineer of the 1st category (designer)
Senior Civil & Structural Engineer
ENGINEER FOR EQUIPMENT MAINTENANCE PLANNING AND PPR
ENGINEER OF THE CONTROL SYSTEM AND DIAGNOSIS OF THE TECHNICAL CONDITION OF THE EQUIPMENT
REPAIR ENGINEER 1 CATEGORY PRODUCTION AND TECHNICAL DEPARTMENT
PROJECT ENGINEER 2 CATEGORY / JUNIOR PROJECT ENGINEER
CHEMICAL ENGINEER
ENGINEER 2 CATEGORY (JUNIOR SHUTDOWN ENGINEER)
1st CATEGORY ENGINEER / PROCESS CONTROL TECHNOLOGIST
SENIOR ELECTRIC ENGINEER (GENERAL FACILITIES)
ENGINEER-INSPECTOR 1 CATEGORY
ENGINEER-INSPECTOR 2 CATEGORIES
ENGINEER 1 CATEGORY FOR THE DEVELOPMENT OF PROCEDURES FOR THE MAIN PRODUCTION SYSTEMS AND INSTALLATIONS OF THE PROCESS LINE SECTION
ENGINEER 1 CATEGORY HVAC / HVAC ENGINEER
DESIGN ENGINEER
TECHNOLOGY ENGINEER 2 CATEGORIES
PROJECT ENGINEER / PROJECT ENGINEER
REPAIR MANAGER OF TECHNOLOGICAL EQUIPMENT
CIVIL AND STRUCTURAL ENGINEER
OPERATOR OF PROCESS PLANTS OF THE 7TH DISTRIBUTION OF THE LNG PLANT OF THE SECTION OF PROCESSING LINES
Head of estimate and contract department / Head of project service & control
CHEMICAL ANALYSIS LABORATORIST 4-5 DISCHARGE
ENGINEER 2 CATEGORY (VIBROMONITORING AND CONTROL GROUP) / JR. CONDITION MONITORING ENGINEER
OPERATOR OF TECHNOLOGICAL INSTALLATIONS (CENTRAL CONTROL PANEL) OF THE AREA OF ENTRANCE FACILITIES
HEAD OF THE GROUP OF METROLOGISTS
FAULT SCOPE ENGINEER 1 CATEGORY / NDT ENGINEER
ENGINEER 1 CATEGORY FOR PRODUCTION PLANNING
DEPUTY PROJECT ENGINEERING MANAGER
TECHNICAL ASSISTANT
SENIOR INSTRUMENT ENGINEER
Operational readiness engineer / OR&A engineer
ENGINEER OF THE CONTROL SYSTEM AND DIAGNOSIS OF THE TECHNICAL CONDITION OF THE EQUIPMENT
CORROSION ENGINEER 2 CATEGORY
OPERATOR OF PROCESS PLANTS 8 DISCHARGE OF LNG PLANT, SECTION OF PROCESS LINES
ELECTRIC ENGINEER 1 CATEGORY
HEAD OF THE LABORATORY FOR METROLOGY OF THE DEPARTMENT OF APCS AND INSTRUMENTATION
Project engineer pre-project preparation / Front End Project Engineer
SENIOR CHEMICAL ANALYSIS LABORATORIST
ENGINEER 2 CATEGORY (ROTATING EQUIPMENT) / JR. ROTATING EQUIPMENT SPECIALIST
ENGINEER 1 CATEGORY (OR&A ENGINEER)
Sabetta - .
________________________________________
SPECIALIST OF THE DEPARTMENT OF CONTROL OF TECHNICAL DOCUMENTATION (CLOCK 30/30)
TRANSLATOR
HEAD OF ENVIRONMENTAL PROTECTION SERVICE
CHIEF SPECIALIST OF INFORMATION SECURITY DEPARTMENT (SABETTA)
DEPUTY HEAD OF THE ENVIRONMENTAL PROTECTION SERVICE
Electrician 3-4 category
Locksmith - machinist

Yamal LNG is an integrated project for the production, liquefaction and sale of gas
Competitive advantages
traditional high concentration reserves located on land
well-studied geology and proven development technologies
very low development and production costs
high efficiency of the liquefaction process due to low average annual temperature
access to the markets of Europe and the Asia-Pacific region
government support, including tax incentives

Project infrastructure

The field development project provides for the drilling of 208 wells at 19 well pads. The gas produced at the field will be supplied to the international market in the form of LNG, for which a gas liquefaction plant will be built, consisting of three technological lines with a capacity of 5.5 million tons of LNG per year each. The infrastructure for loading LNG for export will consist of an unloading rack with two berths in the port of Sabetta, equipped with ice protection facilities. Reinforced ice-class tankers "Arc7" will be used for LNG transportation.

Project implementation status

The final investment decision on the project was made in December 2013, and the start of LNG production is scheduled for 2017.
The main tenders have been completed and key contracts for the supply of materials and equipment and the provision of design and construction services have been concluded. More than 95% of the LNG plant's output has been contracted. The operation of cargo berths in the port of Sabetta has begun, providing year-round delivery of construction cargo. Production drilling and construction and installation works are underway at the facilities of the LNG plant. At the end of 2016, the project was approximately 75% complete.

As part of the Yamal LNG project, it is planned to build the country's largest plant for processing and producing LNG (liquefied natural gas), capable of developing a capacity of about 16,500,000 tons annually based on the resources of the Yuzhno-Tambeyskoye field.
According to PRMS standards, the proven and probable reserves of the gas field are about 900 billion cubic meters. This project involves the implementation of communication paths:
sea ​​port,
transport structure,
modern airport Sabetta.

Work at Yamal LNG

OAO Yamal LNG is one of the leading companies in the region on the Yamal Peninsula, located beyond the Arctic Circle. This enterprise is a joint venture, where NOVATEK owns the controlling stake, TOTAL, CNPC and the Silk Road Fund are involved.
Salary in Yamal LNG starts from 120,000 rubles.

This structure assumes a large number of jobs for . This direction is widely demanded among applicants who are ready to break away from their usual life and move into conditions of hard work for a period of one month or more. The shift schedule is built mainly as follows: 30/15, 30/30, 60/30 - however, there are other options.
Working conditions
The construction of the plant is planned in three phases:
2017
2019
2019
Accordingly, actual vacancies in the project will appear for a long time. Direct employers are ready to offer the best conditions for shift work in the gas industry.
The Yamal LNG plant is located above the Arctic Circle on the northern Yamal Peninsula, at the site of the South Tambeyskoye natural gas field. Construction is successfully carried out in 3 phases in 2017, 2019 and 2019. The natural gas processing project plans to annually produce liquefied gas from 16.5 million tons and up to 1.2 million tons of gas condensate for the market of the Asia-Pacific region and Europe. Job vacancies at the Yamal LNG plant will be available below.

Yamal LNG – Shift Job Search: Latest Vacancies

The shift method is becoming increasingly attractive to many applicants today due to the high salary offered and trips to different regions of the country. Thus, many specialists are interested in vacancies at Yamal LNG with the opportunity to consistently receive good salary, new experience and build a successful career.

To get acquainted with such job offers, it is proposed to take advantage of the extensive opportunities that open up to users on the worldwide web on the site dedicated to employment. There are constantly added many fresh ads. Each of them indicates the basic information on a specific specialty that is of interest to applicants. According to it, it becomes clear how the offer suits the specialist in terms of salary, region of work, responsibilities and other aspects.
Yamal LNG

Yamal LNG is a gas producing company. The project is aimed at the active construction of a plant intended for the production of natural liquefied gas. Within its framework, it is planned to create the necessary facilities.

The project provides for the following areas for natural gas:

  1. mining;
  2. liquefaction;
  3. supplies.

The advantages include having a good resource base as well as a good location, which in combination allows you to achieve excellent results.

This is also facilitated by the work of highly qualified employees who work in various specialties, applying directly in practice the entire scope of their professional knowledge and practical skills.

Current vacancies

On the Internet today it is easy to find a lot of job offers in the company in the following areas:

  • operator of a filling station, treatment facilities;
  • laboratory assistant;
  • storekeeper of fuel and lubricants;
  • instrumentation fitter;
  • translator;
  • geologist;
  • gas cutter;
  • Lead Engineer;
  • process engineer;
  • head of the workshop, department;
  • Instructor;
  • technician;
  • finisher;
  • economist;
  • insulator;
  • head of laboratory;
  • accountant;
  • crane operator;
  • chemical engineer;
  • installer;
  • foreman;
  • slinger;
  • driver;
  • mason;
  • driver;
  • Chief Specialist.

From this extensive list, it becomes clear that the company requires qualified employees in many specialties. Each job at Yamal LNG for vacancies provides for its own list of requirements for candidates and professional duties.

Working conditions

The offered vacancies are of interest to applicants due to attractive conditions. So, employees are provided with everything necessary, officially registered, in accordance with all relevant labor legislation.

The advantages include the offer of a high and stable salary for an interesting job in a friendly team with the opportunity to gain experience, new knowledge, realize your full professional potential, as well as improve your skills. Rotational vacancies at Yamal LNG are distinguished by a convenient work schedule, long vacations, and the opportunity to travel to the regions of the country.

LNG PLANT IN YAMAL

An LNG plant with a capacity of about 16.5 million tons is being built right at the South Tambeyskoye gas field, in the Gulf of Ob. The construction involves a modular type of installation, which seriously reduces the financial costs of construction and determines the schedule for the implementation of the project. This project will contain 3 natural gas liquefaction lines with a capacity of 5.5 million tons each year. The first launch is scheduled for 2017. Taking into account the low average Arctic temperatures, much less specific energy is required for the gas liquefaction process, which makes it possible to achieve large volumes of LNG production compared to projects located in the South and using similar equipment. the mixture from the wells of the field will pass through gas gathering networks to a single complex for gas treatment and liquefaction. Further, at the entrance of the complex there will be a separation process. The inlet facilities include units that regenerate methanol and stabilize the condensate. The separated natural gas will go to production lines, where liquefaction and purification from acid gases and methanol will take place, as well as drying and removal of mercury, extraction of ethane, propane and other heavy hydrocarbons. Further, already purified natural gas will be supplied for cooling and liquefaction. LNG will go for further storage in closed-type isothermal tanks. It is planned to build 4 tanks with a capacity of 160,000 cubic meters each. m. each. Work at the LNG plant IN YAMAL vacancies - read on.

VILLAGE SABETTA - FOR RESIDING OF WORKERS

The village of Sabetta, located on the eastern side of the Yamal Peninsula, is the stronghold of the Yamal LNG. Created here modern infrastructure for the comfortable living of workers, additional life support complexes were built: a warehouse for fuels and lubricants, food storage warehouses, a reliable boiler room, cozy canteens, a medical center, a hotel, a general bath, sports complex, sewer and water treatment facilities. Another canteen, a fire station, a laundry room, a heated parking lot, and additional residential buildings for builders are being built. At the construction stage of the Project, the number of employees is already about 15,000 people. Join and you.

Open vacancies on a Yamal LNG shift:

Locksmiths of various categories (3-6);
engineers of all categories;
machinists;
inspector engineers;
technology of all directions;
entrance facilities specialists;
locksmiths of various qualifications and levels.

In addition, vacancies are often open that do not require work experience, vacancies for laborers, drivers. Also on the project there are vacancies for women.
It should be noted that JSC YAMAL LNG is one of the most attractive employers in the industry, international class standards in social and personnel policy allow the company to offer the best working conditions on the market. A wide range of specialists from various countries. A common goal, a close-knit team are the main components for the successful completion of the project.

Specialists on a rotational basis are offered:
1. social Security;
2. various compensations (accommodation, food);
3. DMS;
4. vouchers to sanatoriums and resorts for recuperation, etc.

Urgent shift work: .

Fill out your CV ➤

Interesting VIDEO film about Yamal:

Jobs at Yamal LNG. Shift work at Sabetta

5 (100%), Ratings: 51